The education period has been shortened from 7 days to 2 days through the cell production support system using the Projection Picking System® (PPS).

Metal products manufacturer for construction, company A
- Background of the implementation
-
-
In the production of a variety of small quantities, the challenge was that the education took time due to the many procedure patterns.
-
Many parts related to production were placed around the cell, causing space constraints.
-
- Impact after implementation
-
-
By displaying videos, images, and comments, there is no need to memorize the procedures, and the average training period has been reduced from 7 days to 2 days.
-
By linking the poka-yoke function of the Projection Picking System® (PPS) with the signals from the torque driver, it has become possible to prevent errors in part retrieval and omissions in screw fastening.
-
By adopting an operation where shelves are replaced for each model, the required space around the cell was reduced by 70%.
-